.
.
October, 2010. Manufacturing of erector at Dneprotyazhmash JSC
.
.
November, 2010. Manufacturing of erector’s arm at Dneprotyazhmash JSC
.
.
July, 2011. Construction of “Dry Launch” production test bed’s foundations in Dneprotyazhmash JSC (Dnerpopetrovsk)
.
.
August, 2011. Construction of “Dry Launch” production test bed in Dneprotyazhmash JSC (Dnerpopetrovsk)
.
.
May, 2012. “Dry Launch” production test bed in Dneprotyazhmash JSC (Dnerpopetrovsk)
.
.
June, 2012. Practical demonstration of erector’s operation at “Dry Launch” production test bed
.
.
June, 2012. Practical demonstration of erector’s operation at “Dry Launch” production test bed
.
.
June, 2012. Practical demonstration of erector’s operation at “Dry Launch” production test bed
.
.
June, 2012. Practical demonstration of erector’s operation at “Dry Launch” production test bed
.
.
February, 2012. Manufacturing of loading system’s tanks at Azovobshchemash Public JSC
.